Plant
Kohler Sanimex plant
Client:
Kohler Sanimex S.A. de C.V. Project scope:
Graycor International proudly signed on to design and construct a structure and perimeter areas to house a special Kohler–designed recovery system responsible for processing all wastewater from Kohler′s existing pottery–plant complex in Monterrey. The project consisted of design–build construction of an FM–approved metal building with block walls, including a concrete mezzanine, an exterior concrete road, and office/laboratory areas to support the recycling system. Graycor managed to install more than five miles of water distribution piping and system inside the operational plant without disrupting production. The successful completion of this project ensured compliance with all Mexican environmental standards as well as substantially reduced operating costs.Browse projects by:
-
Graycor Industrial
- Metals
-
Power
- Air quality and environmental
- Balance of plant
- New generation
- Nuclear
- Transmission and distribution
-
Graycor Construction
- Corporate facilities
- Cultural and educational
- Healthcare
-
Living and lodging
- Hotel
- Other residential
- Resort and spa
- Senior living



