SCR/AQCS installation
Allen S. King Plant SCR and AQCS Installation
Client:
Xcel Energy Architect/Engineer:
Black & VeatchProject scope:
The Allen S. King Plant′s Metropolitan Emissions Project included a selective catalytic reduction (SCR) retrofit and air quality control system (AQCS) installation. Two outages were scheduled. The first consisted of removing ductwork and associated steel, and installing new structural steel and transition ductwork. The second outage included final tie–ins and installation of the catalyst. The total generated power of the plant: 530 megawatts.
Categories: Air quality and environmental | Graycor Industrial | Power | Process | Midwest | Minnesota
Browse projects by:
-
Graycor Industrial
- Metals
-
Power
- Air quality and environmental
- Balance of plant
- New generation
- Nuclear
- Transmission and distribution
-
Graycor Construction
- Corporate facilities
- Cultural and educational
- Healthcare
-
Living and lodging
- Hotel
- Other residential
- Resort and spa
- Senior living