Selective catalytic reduction retrofit
Selective Catalytic Reduction Retrofit
Client:
Xcel Energy Architect/Engineer:
Black & Veatch Project scope:
This project, conducted at the Allen S. King plant, included a selective catalytic reduction (SCR) retrofit and an air quality control systems (AQCS) installation, which required two scheduled outages. The first consisted of removing ductwork and associated steel, and installing new structural steel and transition ductwork. The second outage included final tie-ins and installation of the catalyst. The total generated power of the plant: 530 megawatts.
Browse projects by:
-
Graycor Industrial
- Metals
-
Power
- Air quality and environmental
- Balance of plant
- New generation
- Nuclear
- Transmission and distribution
-
Graycor Construction
- Corporate facilities
- Cultural and educational
- Healthcare
-
Living and lodging
- Hotel
- Other residential
- Resort and spa
- Senior living










