Project Scope

The ONEOK-Propak, Inc. – Riverside Compressor Station is designed to process natural gas through inlet separation and gas compression to meet pipeline quality product. In addition, the Facility is also outfitted with sales gas metering, free liquids handling and storage, as well as pipeline pig receivers and launchers. The Riverside Gas Compressor Facility is rated and licensed to process up to 60 MMSCFD of gas.

The project included the assembly, erection, and installation of pre­fabricated pipe rack modules, process skid modules, shipped loose equipment, and buyout packages. This also involved the assembly and installation of pre-fabricated interconnecting piping spools between pipe rack modules and skid modules.