Project Scope

As  the  mechanical  contractor  for  a  confidential  process  chemical  client, Graycor  supplied  all  labor,  supervision,  tools  and  equipment for  the  structural  steel  erection  for  a  new  warehouse,  manufacturing and  utility  building,  installation  of  metal  floor  and  roof  deck,  pipe rack,  floor  and  roof  decking. Scope  includes  erection  of  900  Tons of  structural  steel,  erection  of  pre-cast  walls  around  the  building and  stairs, offloading,  rigging,   assembly  and  setting  of  32  pieces of process equipment.