Project Scope

AEP contracted Graycor Industrial to remove an existing baghouse and install a new RotoClone® dust removal system on each of the plant’s coal-fired units (1 and 2) that total 2,600 megawatts.

Work included assembly and setting of the Rotoclone® monorail as well as performed repairs to the air heater sector plate and inlet damper.