Project Scope

Graycor completed installation of a new bubbling fluidized bed (BFB) woodwaste fired boiler for the WestRock Demopolis Mill. The scope of work included complete construction and installation of the structural modifications and new equipment for the No. 4 Power Boiler. This included structural, architectural, mechanical, piping, electrical, and instrumentation.